| 402449573 | Form 17 | 11/19/2019 | 7/23/2020 | | 550 | GAS | -- | 20 | GAS | 400 | 400 | Yes | -- | -- | Annual Test 550 PSI with continuous flow, blew down to 20 PSI after 30 min.
PDC has collected a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via
sundry. |
| 402244303 | Form 17 | 11/19/2019 | 11/20/2019 | PLUNGER LIFT | 550 | GAS | -- | 20 | CONTINUOUS | 400 | 425 | Yes | Yes | -- | Annual bradenhead testing. Bradenhead flowed gas continuously during test. Gas will be sampled and test results uploaded into EDD when available. |
| 400292444 | Form 17 | 4/23/2012 | 6/5/2012 | PLUNGER LIFT | 676 | GAS | -- | 142 | GAS | 501 | 540 | No | -- | -- | No fluid was produced during 30 minute blow down |