401961879 | Form 17 | 2/22/2019 | 3/6/2019 | PLUNGER LIFT | 111 | GAS | -- | 1 | GAS | 1 | 1 | Yes | -- | -- | Surface casing produced no fluid. Well shut in for 15min ended with a whisper. Tubing shut in. |
400852073 | Form 17 | 6/2/2015 | 6/11/2015 | PLUNGER LIFT | 399 | GAS | -- | 1 | GAS | 591 | 592 | No | -- | -- | SC PRODUCED NO FLUID. BLEW DOWN AN ADDITIONAL 30 MINS. STILL WHISPERING. SHUT-IN FOR 15 MINS, PRESSURED UP TO A WHISPER. POST REMEDIATION TEST. INITIAL TEST ON 5-28-15 SHOWED 409 PSI WITH GAS. ADDITIONAL 3 MINS, STILL WHISPERING. SHUT IN 15 MINS PRESSURED TO 6 PSI. |
400727825 | Form 17 | 9/4/2014 | 11/10/2014 | PLUNGER LIFT | 256 | GAS | -- | 110 | WATER H20 | 950 | 979 | No | -- | -- | SC PRODUCED 120 GALLONS OF WATER. MONITORED FOR AN ADDITIONAL 30 MINS, SHUT-IN SC WITH 70 PSI, AFTER 15 MINS SC PRESSURE WAS AT 151 PSI. |