Click for Specifics | Full | 2/27/2024 | 3/19/2024 | Plunger Lift | 1 | Whisper | None | -- | No Flow | 1036 | 1037 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
Click for Specifics | Full | 1/16/2023 | 2/13/2023 | Plunger Lift | 2 | Continuous | None | -- | No Flow | 1191 | 1191 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
Click for Specifics | Full | 1/20/2022 | 2/21/2022 | Plunger Lift | 0 | No Flow | None | -- | No Flow | 1358 | 1358 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
402586836 | Form 17 | 1/11/2021 | 1/29/2021 | | 1 | WHISPER | GAS | 0 | NO FLOW | 1833 | 1838 | No | -- | -- | Tubing Shut in. Surface Casing produced no liquid. |
Click for Specifics | Full | 12/8/2020 | 12/21/2020 | Plunger Lift | 9 | Continuous | -- | -- | No Flow | 1880 | 1880 | No | No | No | Tubing Shut in. Surface Casing produced no liquid. |
401919154 | Form 17 | 1/16/2019 | 1/25/2019 | | 42 | GAS | -- | 1 | WHISPER | 1596 | 1594 | No | -- | -- | SURFACE CASING PRODUCED NO FLUIDS. RAN TEST AN EXTRA 30 MIN; ENDED WITH A WHISPER. SHUT-IN FOR 15 MIN; ENDED WITH A WHISPER. WELL AND MASTER VALVE SHUT IN. |
400828883 | Form 17 | 4/15/2015 | 4/22/2015 | PLUNGER LIFT | 1 | GAS | -- | 0 | DOWN TO 0 | 288 | 293 | No | -- | -- | POST REMEDIATION: BLEW-DOWN SURFACE CASING ON 4-8-2015 STARTED WITH 10 PSI. SURFACE CASING PRODUCED NO FLUIDS DURING TEST. SHUT-IN SURFACE CASING FOR 15 MINUTES, ENDED WITH 0 PSI. |
400289204 | Form 17 | 5/8/2012 | 5/25/2012 | PLUNGER LIFT | 372 | GAS | -- | 276 | GAS | 346 | 359 | No | -- | -- | No fluid was produced during 30 minute blow down |