| 401623582 | Form 17 | 4/11/2018 | 4/28/2018 | PLUNGER LIFT | 1 | WHISPER | -- | 0 | DOWN TO 0 | 635 | 622 | No | -- | -- | Surface casing produced no fluids. Surface casing shut in for 15 minutes ended with 0 PSI. Well and master shut in. |
| 401361158 | Form 17 | 7/7/2017 | 8/1/2017 | | 1 | WHISPER | -- | 0 | DOWN TO 0 | -- | -- | No | -- | -- | SC PRODUCE NO FLUID. SHUT IN SC FOR 15 MINS, BUILT UP TO 0 PSI. TUBING AND CASING WERE SHUT UPON ARRIVAL. |
| 401286515 | Form 17 | 5/11/2017 | 5/18/2017 | | 41 | GAS | -- | 17 | CONTINUOUS | 1219 | 1220 | Yes | Yes | Yes | STOPPED TEST SURFACE CASING PRODUCED CONDENSATE. SHUT IN SURFACE CASING FOR 15 MIN ENDED WITH 27 PSI. WELL AND MASTER SHUT IN. |
| 400646839 | Form 17 | 7/16/2014 | 7/18/2014 | PLUNGER LIFT | 117 | GAS | -- | 1 | GAS | 494 | 502 | No | -- | -- | SC PRODUCED NO FLUID |
| 400292264 | Form 17 | 4/19/2012 | 6/5/2012 | PLUNGER LIFT | 427 | GAS | -- | 202 | GAS | 560 | 571 | No | -- | -- | No fluid was produced during 30 minute blow down |