401839148 | Form 17 | 11/2/2018 | 11/14/2018 | | 4 | GAS | -- | 0 | DOWN TO 0 | 291 | 290 | No | -- | -- | SURFACE CASING PRODUCED NO FLUIDS. SHUT-IN FOR 15 MIN; ENDED WITH 0 PSI. WELL AND MASTER VALVE SHUT-IN. |
401753920 | Form 17 | 8/30/2018 | 9/5/2018 | | 7 | GAS | -- | 0 | DOWN TO 0 | 1389 | 1390 | No | -- | -- | Surface casing produced no fluids. Surface casing shut in for 15 min ended with a whisper. Well and master shut in. |
400828870 | Form 17 | 4/14/2015 | 4/22/2015 | PLUNGER LIFT | 1 | GAS | -- | 0 | DOWN TO 0 | 977 | 977 | No | -- | -- | POST REMEDIATION: BLEW-DOWN SURFACE CASING ON 4-8-2015 STARTED WITH A WHISPER OF GAS. SURFACE CASING PRODUCED NO FLUIDS DURING TEST. SHUT-IN SURFACE CASING FOR 15 MINUTES, ENDED WITH 0 PSI. WELL SHUT-IN UPON ARRIVAL. |
400292377 | Form 17 | 4/24/2012 | 6/5/2012 | PLUNGER LIFT | 442 | GAS | -- | 390 | GAS | 354 | 366 | No | -- | -- | No fluid was produced during 30 minute blow down |