401740695 | Form 17 | 8/21/2018 | 8/22/2018 | PLUNGER LIFT | 169 | GAS | -- | 1 | WHISPER | 50 | 50 | No | -- | -- | Surface casing produced no fluids. Blew down surface casing an extra 30 minutes ended with a whisper. Surface casing shut in for 15 minutes ended with a whisper. Well and master valve were shut in. |
401615987 | Form 17 | 4/3/2018 | 4/22/2018 | PLUNGER LIFT | 178 | GAS | -- | 1 | WHISPER | 740 | 739 | Yes | Yes | -- | Surface casing produced no fluids. Blew down surface casing an extra 30 minutes ended with a whisper. Surface casing shut in for 15 minutes ended with a whisper. Well and master shut in. |
400646831 | Form 17 | 7/15/2014 | 7/18/2014 | PLUNGER LIFT | 195 | GAS | -- | 1 | GAS | 540 | 543 | No | -- | -- | SC PRODUCED NO FLUID. |
400526677 | Form 17 | 11/6/2013 | 12/13/2013 | PLUNGER LIFT | 141 | GAS | -- | 5 | GAS | 385 | 387 | No | -- | -- | SURFACE CASING PRODUCED FLUIDS. BLEW SC DOWN FOR RE-PLUMB |
400301207 | Form 17 | 6/20/2012 | 6/29/2012 | PLUNGER LIFT | 160 | GAS | -- | 37 | GAS | 388 | 397 | No | -- | -- | No fluid was produced during 30 minute blow down |