| 401836658 | Form 17 | 11/5/2018 | 11/12/2018 | | 126 | GAS | -- | 1 | WHISPER | 0 | 0 | No | -- | -- | Surface casing produced no fluids. Blew down surface casing an extra 30 min ended with a whisper. Surface casing shut in for 15 min ended with a whisper. Well and master shut in. |
| 401740696 | Form 17 | 8/21/2018 | 8/22/2018 | PLUNGER LIFT | 151 | GAS | -- | 1 | WHISPER | 0 | 0 | No | -- | -- | Surface casing produced no fluids. Blew down surface casing an extra 30 minutes ended with a whisper. Surface casing shut in for 15 minutes ended with a whisper. Well and master valve were shut in. Production casing was on a vacuum. |
| 401615982 | Form 17 | 4/3/2018 | 4/22/2018 | PLUNGER LIFT | 190 | GAS | -- | 1 | WHISPER | 1193 | 1195 | Yes | Yes | -- | Surface casing produced no fluids. Blew down surface casing an extra 30 minutes ended with a whisper. Surface casing shut in for 15 minutes ended with 7 PSI. Well and master shut in. |
| 401193002 | Form 17 | 1/4/2017 | 1/24/2017 | | 168 | GAS | -- | 1 | WHISPER | 450 | 456 | No | -- | -- | SURFACE CASING PRODUCED NO FLUIDS. BLEW DOWN SURFACE CASING AN EXTRA 30 MIN, ENDED WITH 0 PSI. SHUT IN SURFACE CASING FOR 15 MIN, ENDED WITH A WHISPER. |
| 400301209 | Form 17 | 6/20/2012 | 6/29/2012 | PLUNGER LIFT | 100 | GAS | -- | <1 | GAS | 478 | 483 | No | -- | -- | No fluid was produced during 30 minute blow down |