| 401898418 | Form 17 | 1/1/2019 | 1/9/2019 | | 33 | GAS | -- | 0 | DOWN TO 0 | 2029 | 2029 | No | -- | -- | Surface casing produced no fluids. Surface casing shut in for 15 min ended with a whisper. Well and master shut in. |
| 401811570 | Form 17 | 10/19/2018 | 10/26/2018 | | 32 | GAS | -- | 0 | DOWN TO 0 | 2213 | 2213 | No | -- | -- | Surface casing produced no fluids. Surface casing shut in for 15 min ended with 0 PSI. Well and master shut in. |
| 400794204 | Form 17 | 1/28/2015 | 2/18/2015 | PLUNGER LIFT | 15 | GAS | -- | 0 | DOWN TO 0 | 529 | 532 | No | -- | -- | SURFACE CASING DID NOT PRODUCE ANY FLUID. 15 MINUTE BUILD-UP, WHISPER. |
| 400288780 | Form 17 | 5/1/2012 | 5/24/2012 | PLUNGER LIFT | 348 | GAS | -- | 217 | GAS | 581 | 582 | No | -- | -- | No fluid was produced during 30 minute blow down |