| 402732243 | Form 17 | 1/24/2021 | 6/29/2021 | | 185 | CONTINUOUS | GAS | 2 | CONTINUOUS | 477 | 477 | No | -- | -- | Pre P&A, 185 PSI continuous gas and water flow blew down to 7 PSI within thirty minutes. PDC will submit sundry with bradenhead details as soon as possible. PDC will schedule a sampling event and submit results via form 43. |
| Click for Specifics | Light | 3/10/2020 | 12/14/2020 | | 1 | | -- | 0 | | 460 | 460 | No | No | No | |
| 402250648 | Form 17 | 11/23/2019 | 11/29/2019 | PLUNGER LIFT | 85 | GAS | -- | 0 | WATER H20 | 770 | 770 | Yes | Yes | Yes | Annual bradenhead test. Bradenhead flowed gas down to a whisper. Gas sampled and test results will be uploaded into EDD when available. |
| 400289446 | Form 17 | 4/17/2012 | 5/25/2012 | PLUNGER LIFT | 430 | GAS | -- | 352 | GAS | 428 | 434 | No | -- | -- | No fluid was produced during 30 minute blow down |