| 402460418 | Form 17 | 8/5/2020 | 8/5/2020 | | 342 | CONTINUOUS | -- | 1 | WHISPER | 1134 | 1130 | No | -- | -- | Tubing Shut in. Surface Casing produced no liquid. |
| Click for Specifics | Full | 10/14/2019 | 12/20/2019 | | 352 | Gas | -- | 7 | Gas | 1003 | 1004 | No | No | No | Tubing shut in. Surface casing produced no liquid. |
| 400894806 | Form 17 | 8/24/2015 | 9/2/2015 | | 269 | GAS | -- | 1 | GAS | 994 | 994 | No | -- | -- | SC PRODUCED NO FLUIDS DURING TEST. BLEW DOWN SC AN EXTRA 30 MIN ENDED WITH A WHISPER OF GAS. SHUT IN SC FOR 15 MIN ENDED WITH A WHISPER OF GAS. |
| 400828319 | Form 17 | 4/10/2015 | 4/21/2015 | PLUNGER LIFT | 327 | GAS | -- | 66 | GAS | 911 | 911 | No | -- | -- | POST REMEDIATION: BLEW-DOWN SURFACE CASING ON 4/7/15, STARTED WITH 330 PSI. SURFACE CASING PRODUCED NO FLUIDS DURING TEST. MONITORED FOR AN EXTRA 30 MINUTES, ENDED WITH A WHISPER OF GAS. SHUT-IN SURFACE CASING FOR 15 MINUTES, ENDED WITH 17 PSI. WELL SHUT-IN, MASTER CLOSED. |
| 400757391 | Form 17 | 12/1/2014 | 12/22/2014 | PLUNGER LIFT | 302 | GAS | -- | 67 | GAS | 802 | 802 | No | -- | -- | Surface casing did not produce any fluid. 30 min. blowdown, 9. 15 min. build-up, 45. Demco closed upon arrival.
|
| 400317596 | Form 17 | 7/18/2012 | 8/17/2012 | PLUNGER LIFT | 271 | GAS | -- | 184 | GAS | 545 | 551 | No | -- | -- | No fluid was produced during form 17 test. |