Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-27185CAMENISCH-SUPREME CAMP
2-4B
PDC ENERGY INC
69175
SI
9/1/2024
WATTENBERG
90750
EVANS/WELD  123
SWNE 4 4N66W 6
332843
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 416 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404087613Form 172/3/20252/10/2025SHUT-IN30CONTINUOUS WATER AND GAS1 CONTINUOUS 00No----Annual Test. 30 PSI continuous water and gas blew down to 1 PSI within thirty minutes, water and gas observed for entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy.
403728921Form 173/22/20243/22/2024SHUT-IN35CONTINUOUS WATER AND GAS0 WHISPER 00No----Annual test. 35 PSI water and gas flow blew down to 0 PSI in 4 minutes, whisper gas for entire test. PDC will monitor pressure and re-test according to bradenhead policy.
403284619Form 171/9/20231/10/2023SHUT-IN19CONTINUOUS WATER AND GAS0 CONTINUOUS 12001200Yes----Annual Test. 19 PSI water and gas flow blew down to 0 PSI within first minute of test through 1/2" needle valve. 1 quart fluid at open, steady trickle for remainder of test. 2 1/2 gallon total fluid. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly.
402921261Form 171/7/20221/10/2022SHUT-IN0NO FLOW --0 NO FLOW 11001100No----Abatement system follow up test. No pressure or flow observed. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly.
402865839Form 177/7/202111/9/2021SHUT-IN50DOWN TO 0 --0 NO FLOW 00Yes----Post-production, 50 PSI blew down to 0 PSI within first 5 minutes. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will schedule a sampling event and submit results via form 43.
Click for SpecificsLight10/17/202012/3/2020 35 --0No Flow777777NoNoNo 
Click for SpecificsLight6/11/201911/27/2019 20  0No Flow576576NoNoNo