| 402990158 | Form 17 | 3/18/2022 | 3/21/2022 | | 2 | CONTINUOUS | GAS | 0 | NO FLOW | 506 | 507 | No | -- | -- | Tubing Shut in. Surface Casing produced no liquid. |
| Click for Specifics | Full | 7/21/2021 | 8/23/2021 | Plunger Lift | 1 | Whisper | None | -- | No Flow | 428 | 434 | No | N | N | Surface Casing produced no liquid. |
| Click for Specifics | Full | 5/27/2020 | 11/2/2020 | | 1 | Whisper (Very Low Flow) | | 0 | Down To Zero | 397 | 443 | No | No | No | Surface Casing produced no liquid. |
| Click for Specifics | Full | 1/21/2019 | 12/10/2019 | | 1 | Whisper (Very Low Flow) | | 0 | Down To Zero | 377 | 455 | No | No | No | Surface casing produced no liquid. |
| 400845787 | Form 17 | 5/20/2015 | 5/29/2015 | PLUNGER LIFT | 12 | GAS | -- | 1 | GAS | 452 | 455 | No | -- | -- | POST REMEDIATION TEST. SC DID NOT PRODUCE ANY FLUID. 30 MIN BLOW DOWN, WHISPER. 15 MIN BUILD-UP, 3. LEAKING PACKOFF PLATES. INITIAL POST REMEDIATION BLOW DOWN ON 5-13-2015 STARTED WITH 15 BLEW DOWN TO ZERO PSI. |
| 400288708 | Form 17 | 4/26/2012 | 5/24/2012 | PLUNGER LIFT | 301 | GAS | -- | 222 | GAS | 343 | 357 | No | -- | -- | No fluid was produced during the 30 minute blow down |