| 404380427 | Form 17 | 9/18/2025 | 10/6/2025 | SHUT-IN | 29 | DOWN TO 0 | GAS | 0 | NO FLOW | 980 | 980 | No | -- | -- | Remediation follow up test. 29 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404082889 | Form 17 | 2/17/2025 | 2/5/2025 | SHUT-IN | 20 | CONTINUOUS | WATER AND GAS | 20 | CONTINUOUS | 937 | 937 | No | -- | -- | Annual Test. 20 PSI continuous water and gas, did not blow down, water and gas observed for entire test. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403940733 | Form 17 | 9/30/2024 | 10/1/2024 | SHUT-IN | 27 | DOWN TO 0 | GAS | 5 | SURGE | 910 | 910 | No | -- | -- | Remediation follow up test. 27 PSI gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for 10 minutes when foamy liquid hydrocarbon surged and lasted for remainder of test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403684476 | Form 17 | 2/9/2024 | 2/12/2024 | PLUNGER LIFT | 24 | DOWN TO 0 | WATER AND GAS | 20 | CONTINUOUS | 0 | 0 | No | -- | -- | Annual test. 24 PSI water and gas flow blew down to 20 PSI in 30 minutes, ~15 gallons total fluid. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403550767 | Form 17 | 10/4/2023 | 10/5/2023 | SHUT-IN | 24 | CONTINUOUS | GAS | 0 | CONTINUOUS | 841 | 841 | No | -- | -- | Abatement system follow up test. 24 PSI gas flow blew down to 0 PSI in 10 minutes. Water started 10 minutes after open and trickled for entire test, ~8 gallons fluid. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 2/7/2023 | 3/15/2023 | | 10 | Down to Zero | -- | 0 | No Flow | 780 | 780 | No | None | None | |
| 403020115 | Form 17 | 4/15/2022 | 4/19/2022 | SHUT-IN | 15 | CONTINUOUS | WATER AND GAS | 20 | CONTINUOUS | 694 | 694 | Yes | -- | -- | Annual Test, 15 PSI water and gas flow in the first five minutes, with water flow for the remainder of the test, increased to 20 PSI in 30 minutes. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 4/14/2021 | 11/1/2021 | | 40 | Continuous | -- | 0 | No Flow | 327 | 341 | No | None | None | |
| Click for Specifics | Light | 4/29/2020 | 5/11/2020 | | 30 | | -- | 30 | | -- | -- | No | No | No | |
| 401127788 | Form 17 | 5/19/2016 | 10/11/2016 | PLUNGER LIFT | 275 | GAS | -- | 0 | WHISPER | 303 | 305 | No | -- | -- | |
| 400404748 | Form 17 | 4/8/2013 | 4/16/2013 | PLUNGER LIFT | 240 | GAS | -- | 95 | GAS | 353 | 358 | No | -- | -- | Surface casing produced no fluid during the form 17 test. |