Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-26441WERNING
41-3B
PDC ENERGY INC
69175
SI
5/1/2025
WATTENBERG
90750
EVANS/WELD  123
SENE 3 4N66W 6
332845
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 421 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404484129Form 1712/13/202512/22/2025SHUT-IN70CONTINUOUS GAS0 WHISPER 2020No---- 
404225025Form 175/13/20256/2/2025PLUNGER LIFT221CONTINUOUS GAS60 CONTINUOUS 156156No----Remediation follow up test. 221 PSI continuous gas blew down to 60 in thirty minutes, gas continued for entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy.
404087588Form 171/31/20252/10/2025SHUT-IN182CONTINUOUS GAS151 CONTINUOUS 448448No----Annual Test. 182 PSI continuous gas, blew down to 151 PSI in thirty minutes, continuous gas throughout entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy.
404008790Form 1711/21/202411/26/2024SHUT-IN146CONTINUOUS WATER AND GAS0 WHISPER 217258No----Engineering Ad Hoc test. 146 PSI water and gas blew down to 0 PSI in thirty minutes, whisper gas observed throughout entire test, ~10 gal of water. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly.
403693231Form 172/16/20242/20/2024PLUNGER LIFT42CONTINUOUS GAS10 CONTINUOUS 299240No----Annual test. 42 PSI gas flow turned to continuous water flow after 5 minutes and lasted for remainder of test, ~15 gallons. PDC will monitor pressure and re-test according to bradenhead policy.
403298972Form 171/19/20231/23/2023PLUNGER LIFT40DOWN TO 0 GAS6 CONTINUOUS 295295Yes----Annual Test. 40 PSI gas flow blew down to 6 PSI in 30 minutes. Fluid started at 15 minutes and lasted until the end of the test. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly.
Click for SpecificsFull10/24/202211/8/2022Plunger Lift35Down to Zero--0No Flow215230NoNoneNone 
Click for SpecificsFull7/22/202111/1/2021 0No Flow--0No Flow10761076NoNoneNone 
Click for SpecificsLight11/23/202012/14/2020 0 --0No Flow00NoNoNo 
Click for SpecificsLight6/13/201911/27/2019 0  0 745745NoNoNo