| 404384640 | Form 17 | 8/4/2025 | 10/8/2025 | SHUT-IN | 17 | DOWN TO 0 | GAS | 0 | NO FLOW | 0 | 0 | No | -- | -- | Pre-P&A. 17 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. |
| Click for Specifics | Full | 4/17/2025 | 4/21/2025 | | 36 | Continuous | -- | 0 | No Flow | 0 | 0 | No | No | No | Annual Test. 36 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403693524 | Form 17 | 2/20/2024 | 2/21/2024 | SHUT-IN | 239 | CONTINUOUS | GAS | 62 | CONTINUOUS | 1478 | 1478 | No | -- | -- | Annual test. 239 PSI continuous gas flow blew down to 62 PSI in 30 minutes. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403452973 | Form 17 | 7/3/2023 | 7/5/2023 | SHUT-IN | 72 | CONTINUOUS | WATER AND GAS | 0 | NO FLOW | 1420 | 1420 | Yes | -- | -- | Abatement system follow up test. 72 PSI water and gas flow blew down to 0 PSI within first 10 minutes of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
| 403361264 | Form 17 | 3/30/2023 | 3/30/2023 | SHUT-IN | 54 | CONTINUOUS | GAS | TSTM | WHISPER | 1390 | 1390 | Yes | -- | -- | Abatement system follow up test. 54 PSI continuous gas flow blew down to TSTM PSI in 30 minutes. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
| 403303917 | Form 17 | 1/26/2023 | 1/27/2023 | SHUT-IN | 75 | CONTINUOUS | GAS | TSTM | WHISPER | 1350 | 1350 | Yes | -- | -- | Annual Test. 75 PSI gas flow blew down to almost 0 PSI in 30 minutes. PDC collected a sample 8/29/2022. PDC will continue to monitor monthly. |
| 403207085 | Form 17 | 10/24/2022 | 10/25/2022 | SHUT-IN | 60 | CONTINUOUS | GAS | 0 | WHISPER | 1350 | 1350 | Yes | -- | -- | Annual Test. 60 PSI whisper gas blew down to 0 PSI in 30 minutes. PDC collected a sample 8/29/2022. PDC will continue to monitor monthly. |
| 402813924 | Form 17 | 9/13/2021 | 9/16/2021 | SHUT-IN | 15 | CONTINUOUS | WATER AND GAS | 15 | CONTINUOUS | 1141 | 1141 | Yes | -- | -- | Annual Test, 15 PSI water and gas flow maintained pressure for the duration of the test. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly. |
| 402720675 | Form 17 | 4/30/2021 | 6/16/2021 | SHUT-IN | 20 | CONTINUOUS | WATER H20 | 20 | CONTINUOUS | 993 | 993 | No | -- | -- | Abatement system follow up test, 20 PSI continuous water flow, maintained pressure. PDC will submit sundry with bradenhead details as soon as possible. PDC will schedule a sampling event and submit results via form 43. |
| 402777887 | Form 17 | 12/20/2020 | 8/12/2021 | SHUT-IN | 60 | CONTINUOUS | GAS | 0 | NO FLOW | 712 | 711 | Yes | -- | -- | Abatement system follow up test, 60 PSI gas flow blew down to 0 PSI within first ten minutes of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
| 402440180 | Form 17 | 5/29/2020 | 7/9/2020 | | 50 | WATER H20 | -- | 0 | NO FLOW | 636 | 636 | Yes | -- | -- | Annual Test 50 PSI with continuous flow, blew down to 0 PSI after 30 min. PDC has collected a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry. |
| Click for Specifics | Light | 6/7/2019 | 11/27/2019 | | 0 | | | 0 | | 1136 | 1136 | No | No | No | |