| 403885316 | Form 17 | 8/8/2024 | 8/12/2024 | SHUT-IN | 0 | WHISPER | GAS | 0 | NO FLOW | 500 | 500 | No | -- | -- | Pre-P&A. 0 PSI, with no flow observed for 30 minutes. |
| 403684677 | Form 17 | 2/9/2024 | 2/12/2024 | PLUNGER LIFT | 0 | CONTINUOUS | GAS | 0 | NO FLOW | 389 | 389 | No | -- | -- | Annual test. 0 PSI continuous gas flow for 2 minutes. No flow or pressure for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 2/20/2023 | 3/15/2023 | | 2 | Down to Zero | -- | 0 | Down to Zero | 544 | 544 | No | None | None | |
| Click for Specifics | Full | 8/12/2022 | 9/6/2022 | | 4 | Down to Zero | -- | 0 | Down to Zero | 460 | 460 | No | None | None | |
| Click for Specifics | Full | 3/5/2021 | 11/1/2021 | | 4 | Down to Zero | -- | 0 | No Flow | 472 | 479 | No | None | None | |
| Click for Specifics | Light | 8/9/2020 | 12/3/2020 | | 5 | | -- | 0 | No Flow | 552 | 552 | No | No | No | |
| Click for Specifics | Light | 6/13/2019 | 11/27/2019 | | 0 | | | 0 | | 578 | 578 | No | No | No | |