| 401753951 | Form 17 | 8/24/2018 | 9/5/2018 | | 8 | GAS | -- | 0 | DOWN TO 0 | 42 | 42 | No | -- | -- | Surface casing produced no fluids. Surface casing shut in for 15 min ended with 0 PSI. Well and master shut in. |
| 401494906 | Form 17 | 12/12/2017 | 12/22/2017 | PLUNGER LIFT | 1 | WHISPER | -- | 0 | DOWN TO 0 | 48 | 48 | No | -- | -- | Surface casing produced no fluids. Shut in surface casing for 15 min ended with 0 psi. Well and mater shut in. |
| 401397627 | Form 17 | 9/5/2017 | 9/7/2017 | | 6 | GAS | -- | 0 | DOWN TO 0 | 217 | 217 | No | -- | -- | WELL WAS NOT BUILT UP. MASTER VALVE WOULD NOT OPEN. SURFACE CASING PRODUCED NO FLUIDS. SURFACE CASING SHUT IN FOR 15 MIN ENDED WITH 0 PSI. |
| 401255514 | Form 17 | 4/7/2017 | 4/10/2017 | | 142 | GAS | -- | 1 | WHISPER | 158 | 158 | No | -- | -- | SURFACE CASING PRODUCED NO FLUIDS. BLEW DOWN SURFACE CASING AN EXTRA 30 MIN; ENDED WITH A WHISPER. SHUT IN SURFACE CASING FOR 15 MIN; ENDED WITH 8 PSI. |
| 400768693 | Form 17 | 12/16/2014 | 1/12/2015 | PLUNGER LIFT | 142 | GAS | -- | 1 | GAS | 666 | 667 | No | -- | -- | Surface casing produced no fluids during test. Monitored extra 30 minutes ended with a whisper of gas. Shut in surface casing for
15 minutes pressure built up to 88 psi. |
| 400356450 | Form 17 | 10/10/2012 | 12/11/2012 | PLUNGER LIFT | 43 | GAS | -- | <1 | GAS | 486 | 496 | No | -- | -- | No fluid was produced during form 17 test. |