| 402999265 | Form 17 | 3/23/2022 | 3/30/2022 | | 0 | NO FLOW | NONE | 0 | NO FLOW | 762 | 762 | No | -- | -- | Tubing Shut in. Surface Casing produced no liquid. |
| Click for Specifics | Full | 4/16/2021 | 5/17/2021 | Plunger Lift | 0 | No Flow | None | -- | No Flow | 822 | 822 | No | No | No | Tubing Shut in. Surface Casing produced no liquid. |
| Click for Specifics | Full | 3/11/2020 | 6/8/2020 | | 1 | Whisper (Very Low Flow) | | 0 | Down To Zero | 830 | 830 | No | No | No | Tubing shut in. Surface casing produced no liquid. |
| Click for Specifics | Full | 10/17/2019 | 12/10/2019 | | 1 | Whisper (Very Low Flow) | | 0 | Down To Zero | 945 | 944 | No | No | No | Tubing shut in. Surface casing produced no liquid. |
| 400828976 | Form 17 | 4/15/2015 | 4/22/2015 | PLUNGER LIFT | 1 | GAS | -- | 0 | DOWN TO 0 | 1067 | 1066 | No | -- | -- | POST REMEDIATION: AFTER 15 MINUTE SHUT-IN, SURFACE CASING STAYED AT 0 PSI. DEMCO CLOSED AND WELL SHUT-IN UPON ARRIVAL. POST REMEDIATION TEST ON 4-9-2015, PRESSURE WAS AT A WHISPER AND BLEW-DOWN TO 0 PSI. |
| 400319495 | Form 17 | 7/17/2012 | 8/23/2012 | PLUNGER LIFT | 196 | GAS | -- | 92 | GAS | 529 | 537 | No | -- | -- | No fluid was produced during form 17 test. |