402272079 | Form 17 | 12/19/2019 | 12/26/2019 | PLUNGER LIFT | 37 | GAS | -- | 1 | WHISPER | 561 | 560 | No | -- | -- | SURFACE CASING PRODUCED NO FLUIDS. TUBING SHUT IN |
401994959 | Form 17 | 3/21/2019 | 4/3/2019 | PLUNGER LIFT | 30 | GAS | -- | 0 | DOWN TO 0 | 936 | 936 | No | -- | -- | Surface casing produced no fluid. Well shut in for 15min ended with a whisper. Tubing shut in. |
401906574 | Form 17 | 1/10/2019 | 1/16/2019 | | 31 | GAS | -- | 0 | DOWN TO 0 | 627 | 627 | No | -- | -- | SURFACE CASING PRODUCED NO FLUIDS. SHUT IN 15 MIN ENDED WITH WHISPER. WELL AND MASTER SHUT IN. |
401780385 | Form 17 | 9/17/2018 | 10/1/2018 | | 44 | GAS | -- | 1 | WHISPER | 897 | 897 | No | -- | -- | SURFACE CASING PRODUCED NO FLUIDS. EXTRA 30 MIN ENDED WITH WHISPER. SHUT IN 15 MIN ENDED WITH WHISPER. |
400842199 | Form 17 | 4/22/2015 | 5/21/2015 | PLUNGER LIFT | 1 | GAS | -- | 0 | DOWN TO 0 | 368 | 368 | No | -- | -- | POST REMEDIATION TEST. SC DID NOT PRODUCE ANY FLUID. 15 MIN BUILD-UP, DEAD. TEMP SHUT-IN FOR HZ PREP AND GROUND VALVE CLOSED UPON ARRIVAL. INITIAL POST REMEDIATION BLOWDOWN ON 4-9-15 STARTED WITH A WHISPER. BLEW DOWN TO ZERO PSI. |
400528369 | Form 17 | 12/26/2012 | 12/17/2013 | PLUNGER LIFT | 157 | GAS | -- | 29 | GAS | 402 | 427 | No | -- | -- | NO FLUID WAS PRODUCED DURING FORM 17 TEST. |
400369123 | Form 17 | 12/20/2012 | 1/14/2013 | PLUNGER LIFT | 193 | GAS | -- | 124 | GAS | 461 | 463 | No | -- | -- | No fluid was produced during form 17 test. |