| 402257329 | Form 17 | 12/5/2019 | 12/9/2019 | PLUNGER LIFT | 40 | GAS | -- | 0 | DOWN TO 0 | 220 | 214 | Yes | -- | -- | surface casing produced no fluids. tubing shut in. |
| 401960307 | Form 17 | 2/28/2019 | 3/5/2019 | PLUNGER LIFT | 112 | GAS | -- | 1 | GAS | 244 | 244 | No | -- | -- | Surface casing produced no fluid. Well shut in for 15min ended with pressure. Tubing shut in. |
| 401855678 | Form 17 | 11/21/2018 | 11/29/2018 | | 148 | GAS | -- | 1 | WHISPER | 258 | 258 | No | -- | -- | SURFACE CASING PRODUCED NO FLUIDS. RAN TEST AN EXTRA 30 MIN; ENDED WITH 0 PSI. SHUT-IN FOR 15 MIN; ENDED WITH A WHISPER. WELL AND MASTER VALVE SHUT-IN. |
| 400895346 | Form 17 | 4/14/2015 | 9/3/2015 | | 1 | GAS | -- | 0 | DOWN TO 0 | 166 | 167 | No | -- | -- | POST REMEDIATION TEST. INITIAL POST REMEDIATION BLOWDOWN ON 4-8-15 STARTED WITH A WHISPER BLEW DOWN TO ZERO PSI. SC DID NOT PRODUCE ANY FLUID. 15 MIN BUILD UP, DEAD. TEMP SHUT IN FOR HZ PREP AND TORN APART UPON ARRIVAL. |
| 400828826 | Form 17 | 4/14/2015 | 4/22/2015 | PLUNGER LIFT | 1 | GAS | -- | 0 | DOWN TO 0 | 166 | 167 | No | -- | -- | POST REMEDIATION TEST. INITIAL POST REMEDIATION BLOW-DOWN ON 4-8-2015 STARTED WITH A WHISPER, BLEW-DOWN TO 0 PSI. SURFACE CASING DID NOT PRODUCE ANY FLUID. 15 MINUTE BUILD-UP, DEAD. TEMP. SHUT-IN FOR HZ PREP AND TORN APART UPON ARRIVAL. |
| 400660470 | Form 17 | 7/31/2014 | 8/11/2014 | PLUNGER LIFT | 320 | GAS | -- | 198 | GAS | 621 | 623 | No | -- | -- | SC produced no fluid. Blew down well an additional 30 mins, ending pressure was 76 psi. |
| 400659903 | Form 17 | 7/30/2014 | 8/8/2014 | PLUNGER LIFT | 404 | GAS | -- | 236 | GAS | 614 | 614 | No | -- | -- | Monitored extra thirty minutes and shut in surface casing for 15 minutes stayed at 236psi. Surface casing produced no fluids. Performed form 17 test as requested by Anne Kremer |