402043177 | Form 17 | 4/30/2019 | 5/14/2019 | PLUNGER LIFT | 354 | GAS | -- | 1 | GAS | 758 | 756 | Yes | -- | -- | Surface casing produced no fluid. Well shut in for 15min ended with 15psi. Surface casing blown down an extra 30min ended with a whisper. Tubing shut in. |
400982587 | Form 17 | 4/14/2015 | 2/2/2016 | | 159 | GAS | -- | 1 | GAS | -- | -- | No | -- | -- | POST REMEDIATION TEST. INITIAL POST REMEDIATION BLOW DOWN ON 4-9-15 STARTED WITH 18 BLEW DOWN TO ZERO PSI. CASING HAD A VACUUM BEFORE AND AFTER TEST. SC DID NOT PRODUCE ANY FLUID. 15 MIN BUILD UP, WHISPER. OPEN TO SALES, TEMP SHUT IN FOR HZ PREP AND SHUT IN UPON ARRIVAL. |
400992095 | Form 17 | 9/30/2014 | 2/18/2016 | PLUNGER LIFT | 121 | GAS | -- | >14 | GAS | -- | -- | No | -- | -- | CASING INACCESSIBLE---SC did not produce any fluid during test. Blew down extra 30 minutes ended with a whisper of gas. Shut in SC for 15 minutes pressure built up to 6 psi. Tubing and casing were closed and locked out. |
400290206 | Form 17 | 4/19/2012 | 5/29/2012 | PLUNGER LIFT | 125 | GAS | -- | 25 | GAS | 311 | 312 | No | -- | -- | No fluid was produced during 30 minute blow down |