| 402741230 | Form 17 | 2/28/2021 | 7/8/2021 | PLUNGER LIFT | 85 | DOWN TO 0 | GAS | 0 | | 224 | 224 | Yes | -- | -- | Pre P&A, 85 PSI blew down with gas to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will schedule a sampling event and submit results via form 43. |
| 402518370 | Form 17 | 10/18/2020 | 10/26/2020 | | 75 | GAS | -- | 0 | NO FLOW | 243 | 166 | No | -- | -- | Annual Test 75 PSI with continuous flow, blew down to 0 PSI after 30 min. PDC has collected a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry. |
| Click for Specifics | Light | 4/19/2019 | 8/18/2020 | | 0 | | -- | 0 | | 787 | 787 | No | No | No | |