| 403289902 | Form 17 | 1/12/2023 | 1/13/2023 | SHUT-IN | 32 | CONTINUOUS | GAS | 0 | NO FLOW | 590 | 590 | Yes | -- | -- | Pre-P&A. 32 PSI gas flow blew down to 0 PSI within 5 minutes. No flow or pressure for the remainder of the test. PDC will schedule a sampling event and submit results via form 43. |
| Click for Specifics | Full | 10/6/2022 | 11/8/2022 | Shut-In | 46 | Down to Zero | -- | 0 | No Flow | 774 | 774 | No | None | None | |
| 402904309 | Form 17 | 12/19/2021 | 12/20/2021 | PLUNGER LIFT | 75 | CONTINUOUS | GAS | 0 | NO FLOW | 529 | 529 | Yes | -- | -- | Monthly Gauge High Pressure Follow-Up, 75 PSI gas flow blew down to 0 PSI within first 5 minutes of test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 10/30/2021 | 11/22/2021 | | 37 | Down to Zero | -- | 0 | No Flow | 532 | 538 | No | None | None | |
| Click for Specifics | Light | 10/18/2020 | 12/3/2020 | | 30 | | -- | 0 | No Flow | 358 | 358 | No | No | No | |
| Click for Specifics | Light | 4/19/2019 | 8/18/2020 | | 8 | | -- | 0 | | 590 | 590 | No | No | No | |