| 402728704 | Form 17 | 6/21/2021 | 6/24/2021 | | 0 | NO FLOW | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | Tubing Shut in. Surface Casing produced no liquid. |
| 402512882 | Form 17 | 10/12/2020 | 10/16/2020 | | 1 | WHISPER | -- | 1 | WHISPER | 1 | 1 | No | -- | -- | Tubing Shut in. Surface Casing produced no liquid. |
| 402438796 | Form 17 | 1/7/2020 | 7/7/2020 | | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | SURFACE CASING PRODUCED NO FLUIDS. |
| 402232350 | Form 17 | 11/2/2019 | 11/6/2019 | PLUNGER LIFT | 46 | WATER H20 | -- | 1 | WHISPER | 1 | 1 | No | -- | -- | Surface casing produced water. Tubing shut in. |
| 402104758 | Form 17 | 6/18/2019 | 7/11/2019 | PLUNGER LIFT | 85 | WATER H20 | -- | 1 | WHISPER | -- | -- | No | -- | -- | SUrface casing producced water. 15 minute shut in resulted in 6 psi. Tubing and casing not built. |
| 400982602 | Form 17 | 6/9/2015 | 2/2/2016 | | 4 | GAS | -- | 1 | GAS | -- | -- | No | -- | -- | POST REMEDIATION TEST. SC DID NOT PRODUCE ANY FLUID. FRAC VALVE STABBED AND WELL TORN APART UPON ARRIVAL. 30 MIN BLOW DOWN, WHISPER. 15 MIN BUILD UP, 3. POST REMEDIATION BLOW DOWN ON 6-1-15 STARTED WITH 49 BLEW DOWN TO ZERO PSI. |
| 400563771 | Form 17 | 1/20/2014 | 2/27/2014 | PLUNGER LIFT | 261 | GAS | -- | 64 | GAS | 745 | 771 | No | -- | -- | SC PRODUCED NO FLUID. |
| 400317277 | Form 17 | 7/31/2012 | 8/17/2012 | PLUNGER LIFT | 253 | GAS | -- | 127 | GAS | 508 | 513 | No | -- | -- | No fluid was produced during form 17 test. No transducer to surface casing. |