| 404380431 | Form 17 | 9/18/2025 | 10/6/2025 | SHUT-IN | 24 | DOWN TO 0 | GAS | 0 | NO FLOW | 0 | 0 | No | -- | -- | Remediation follow up test. 24 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404083202 | Form 17 | 1/17/2025 | 2/5/2025 | SHUT-IN | 20 | CONTINUOUS | WATER AND GAS | 20 | NO FLOW | 0 | 0 | No | -- | -- | Annual Test. 20 PSI continuous water and gas, did not blow down, water and gas observed entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403940739 | Form 17 | 9/30/2024 | 10/1/2024 | SHUT-IN | 19 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 0 | 0 | No | -- | -- | Remediation follow up test. 19 PSI water and gas flow blew down to 0 PSI within first few seconds of test. Water continued to trickle for the remainder of the test, ~2 gallons total fluid. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403684501 | Form 17 | 2/9/2024 | 2/12/2024 | PLUNGER LIFT | 28 | DOWN TO 0 | WATER AND GAS | 14 | CONTINUOUS | 0 | 0 | No | -- | -- | Annual test. 28 PSI water and gas flow blew down to 14 PSI in 30 minutes, ~15 gallons total fluid. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403550771 | Form 17 | 10/4/2023 | 10/5/2023 | SHUT-IN | 25 | CONTINUOUS | GAS | 0 | CONTINUOUS | 380 | 380 | No | -- | -- | Abatement system follow up test. 25 PSI gas flow blew down to 0 PSI in 5 minutes. Black fluid started 3 minutes after open and trickled for entire test, ~10 gallons fluid. PDC will continue to monitor monthly. |
| 403387215 | Form 17 | 4/26/2023 | 4/27/2023 | SHUT-IN | 275 | CONTINUOUS | GAS | 3 | CONTINUOUS | 1024 | 1024 | Yes | -- | -- | High Pressure Verification. 275 PSI continuous gas flow blew down to 3 PSI in 30 minutes. Sample collected 2/24/2023. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 2/7/2023 | 3/15/2023 | | 0 | No Flow | -- | 0 | No Flow | 0 | 0 | No | None | None | |
| 403037160 | Form 17 | 4/15/2022 | 5/4/2022 | SHUT-IN | 0 | NO FLOW | WATER H20 | 0 | CONTINUOUS | 2 | 2 | Yes | -- | -- | Annual Test, 0 PSI for the duration of the test. Water began to flow after 5 minutes. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly. |
| 402720705 | Form 17 | 5/8/2021 | 6/16/2021 | PLUNGER LIFT | 2 | DOWN TO 0 | GAS AND VAPOR | 0 | | 725 | 725 | No | -- | -- | Abatement system follow up test, 2 PSI whisper blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. |
| Click for Specifics | Full | 4/16/2021 | 11/1/2021 | | 0 | Down to Zero | -- | 0 | No Flow | 2 | 2 | No | None | None | |
| Click for Specifics | Light | 5/1/2020 | 5/11/2020 | | 179 | | -- | 179 | | -- | -- | No | No | No | |
| 402473756 | Form 17 | 5/1/2020 | 8/24/2020 | SHUT-IN | 179 | CONTINUOUS | -- | 0 | NO FLOW | 890 | 890 | No | -- | -- | Annual Test, 179 PSI blew down to 0 PSI after the first 2 minutes of test. no pressure or flow was observed for the remainder of the test. PDC will submit a remediation plan via sundry. |
| 401525706 | Form 17 | 1/12/2018 | 1/25/2018 | PLUNGER LIFT | 125 | DOWN TO 0 | -- | 0 | | 508 | 508 | Yes | Yes | -- | BLEWDOWN TO ZERO NO PSI NO FLOW AT END OF TEST. |
| 400503741 | Form 17 | 10/15/2013 | 10/28/2013 | PLUNGER LIFT | 330 | GAS | -- | 203 | GAS | 260 | 274 | No | -- | -- | SURFACE CASING PRODUCED NO FLUID DURING TEST. BLEW DOWN FOR AN ADDITIONAL 8 HRS. DID NOT PERFORM REPLUMB. |
| 400404776 | Form 17 | 4/8/2013 | 4/16/2013 | PLUNGER LIFT | 287 | GAS | -- | 194 | GAS | 315 | 325 | No | -- | -- | Surface casing produced no fluid during the form 17 test. |