| 403865919 | Form 17 | 7/25/2024 | 7/25/2024 | | 2 | CONTINUOUS | GAS | 0 | NO FLOW | 923 | 922 | No | -- | -- | PRE P/A Tubing Shut in. Surface Casing produced no liquid. |
| Click for Specifics | Full | 5/24/2023 | 6/28/2023 | Plunger Lift | 0 | No Flow | None | -- | No Flow | 922 | 922 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
| Click for Specifics | Full | 3/4/2022 | 4/18/2022 | Plunger Lift | 0 | No Flow | None | -- | No Flow | 895 | 895 | No | N | N | Tubing Shut in. Surface Casing produced no liquid. |
| Click for Specifics | Full | 3/12/2021 | 4/19/2021 | Plunger Lift | 0 | No Flow | None | -- | No Flow | 885 | 885 | No | No | No | Tubing Shut in. Surface Casing produced no liquid. |
| Click for Specifics | Full | 1/30/2020 | 6/8/2020 | | 0 | Down To Zero | | 0 | Down To Zero | 824 | 824 | No | No | No | Tubing shut in. Surface casing produced no liquid. |
| Click for Specifics | Full | 10/21/2019 | 12/10/2019 | | 1 | Whisper (Very Low Flow) | | 0 | Down To Zero | 740 | 743 | No | No | No | Tubing shut in. Surface casing produced no liquid. |
| 400868658 | Form 17 | 6/24/2015 | 7/15/2015 | PLUNGER LIFT | 1 | GAS | -- | 0 | DOWN TO 0 | 1777 | 1777 | No | -- | -- | POST REMEDIATION TEST. SC DID NOT PRODUCE ANY FLUID. 15 MIN BUILD UP, WHISPER. INITIAL POST REMEDIATION BLOW DOWN ON 6-19-2015 STARTED WITH A WHIPSER AND BLEW DOWN TO ZERO PSI. |
| 400526750 | Form 17 | 11/18/2013 | 12/13/2013 | PLUNGER LIFT | 124 | GAS | -- | 8 | GAS | 408 | 417 | No | -- | -- | SURFACE CASING PRODUCED NO FLUID. |