401740679 | Form 17 | 8/20/2018 | 8/22/2018 | PLUNGER LIFT | 13 | GAS | -- | 1 | WHISPER | 849 | 850 | No | -- | -- | Surface casing produced no fluids. Blew down surface casing an extra 30 minutes ended with a whisper. Surface casing shut in for 15 minutes ended with a whisper. Well and master valve were shut in. |
401682197 | Form 17 | 6/20/2018 | 6/21/2018 | PLUNGER LIFT | 20 | GAS | -- | 0 | DOWN TO 0 | 826 | 826 | No | -- | -- | Surface casing produced no fluids. Surface casing shut in for 15 minutes ended with a whisper. Well and master valve were shut in. |
401141503 | Form 17 | 10/20/2016 | 11/2/2016 | | 17 | GAS | -- | 0 | GAS | 480 | 480 | No | -- | -- | SC PRODUCED NO FLUIDS DURING TEST. SHUT IN SC FOR 15 MIN ENDED WITH A WHISPER. |