| 401825452 | Form 17 | 10/30/2018 | 11/5/2018 | | 266 | GAS | -- | 1 | WHISPER | 958 | 958 | No | -- | -- | SURFACE CASING PRODUCED NO FLUID. EXTRA 30 MIN; ENDED WITH A WHISPER. SHUT IN FOR 15 MIN; ENDED WITH 7 PSI. |
| 401696586 | Form 17 | 7/3/2018 | 7/9/2018 | | 272 | GAS | -- | 1 | WHISPER | 930 | 941 | No | -- | -- | SURFACE CASING PRODUCED NO FLUIDS. SURFACE CASING BLOWN DOWN FOR EXTRA 30 MIN ENDED WITH A WHISPER. SURFACE CASING SHUT IN FOR 15 MIN ENDED WITH 5 PSI. WELL AND MASTER WERE SHUT IN. |
| 401521168 | Form 17 | 1/12/2018 | 1/22/2018 | | 261 | GAS | -- | 1 | WHISPER | 838 | 835 | Yes | Yes | -- | Surface casing produced no fluids. Blew down surface casing an extra 30 min ended with a whisper. Surface casing shut in for 15 min ended with 6 PSI. Master valve was shut.
|
| 400851985 | Form 17 | 5/27/2015 | 6/11/2015 | PLUNGER LIFT | 258 | GAS | -- | 1 | GAS | 286 | 310 | No | -- | -- | POST REMEDIATION TEST. SC DID NOT PRODUCE ANY FLUID. 30 MIN BLOWDOWN, WHISPER. 15 MIN BUILD-UP, 6. INITIAL POST REMEDIATION BLOW DOWN ON 5-20-15 STARTED WITH 296 WITH 296 AND BLEW DOWN TO A WHISPER. |
| 400647377 | Form 17 | 7/2/2014 | 7/21/2014 | PLUNGER LIFT | 75 | GAS | -- | 1 | GAS | 264 | 307 | No | -- | -- | SURFACE CASING PRODUCED NO FLUIDS DURING TEST |