| Click for Specifics | Full | 5/8/2024 | 5/21/2024 | | 0 | No Flow | -- | 0 | No Flow | 0 | 0 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 5/25/2023 | 6/5/2023 | Shut-In | 2 | Down to Zero | -- | 0 | Down to Zero | 650 | 650 | No | None | None | |
| 403025364 | Form 17 | 4/14/2022 | 4/24/2022 | PLUNGER LIFT | 1 | WHISPER | GAS | 0 | NO FLOW | 344 | 268 | No | -- | -- | Test per NTO. Whisper on open for 1 minute and died. No flow for remainder of test. |
| 402711812 | Form 17 | 6/2/2021 | 6/8/2021 | PLUNGER LIFT | 0 | NO FLOW | NONE | 0 | NO FLOW | 356 | 275 | No | -- | -- | Test per NTO. BH dead. |
| Click for Specifics | Light | 11/12/2020 | 12/3/2020 | Shut-In | 0 | | -- | 0 | No Flow | 375 | 385 | No | No | No | Test per NTO. Dead at open. |
| 402310965 | Form 17 | 10/30/2019 | 2/12/2020 | FLOWING | 2 | DOWN TO 0 | -- | 0 | NO FLOW | 540 | 551 | No | -- | -- | Test per NTO. BH dead. |