| Click for Specifics | Light | 4/15/2025 | 4/21/2025 | | 0 | | -- | 0 | | 0 | 0 | No | No | No | |
| 403703887 | Form 17 | 2/29/2024 | 2/29/2024 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | This well is currently on a blowdown/build cycle. 0 PSI, no pressure or flow observed for the entire test. PDC will open back up to blowdown and re-test in 30 days. |
| 403674300 | Form 17 | 1/31/2024 | 2/1/2024 | SHUT-IN | 10 | CONTINUOUS | GAS | 0 | NO FLOW | 0 | 0 | No | -- | -- | This well is currently on a blowdown/build cycle. 10 PSI blew down to 0 PSI within first 45 seconds of test. No pressure or flow observed for the remainder of the test. PDC will open back up to blowdown and re-test in 30 days. |
| 403649732 | Form 17 | 1/9/2024 | 1/10/2024 | SHUT-IN | 9 | DOWN TO 0 | GAS | 0 | NO FLOW | 0 | 0 | No | -- | -- | This well is currently on a blowdown/build cycle. 9 PSI blew down to 0 PSI within first 40 seconds of test. No pressure or flow observed for the remainder of the test. PDC will open back up to blowdown and re-test in 30 days. |
| 403625110 | Form 17 | 12/13/2023 | 12/14/2023 | SHUT-IN | 13 | CONTINUOUS | GAS | 0 | NO FLOW | 0 | 0 | No | -- | -- | This well is currently on a blowdown/build cycle. 13 PSI blew down to 0 PSI within first 75 seconds of test, light vapor until 12 minute mark. No pressure or flow observed for the remainder of the test. PDC will open back up to blowdown and re-test in 30 days. |
| 403595675 | Form 17 | 11/9/2023 | 11/14/2023 | SHUT-IN | 4 | CONTINUOUS | GAS | 0 | NO FLOW | 0 | 0 | No | -- | -- | This well is currently on a 7 month blowdown/build cycle. 4 PSI blew down to 0 PSI within first 30 seconds of test, no pressure or flow observed for the remainder of the test. PDC will open back up to blowdown and re-test in 30 days. |
| 403574335 | Form 17 | 10/13/2023 | 10/26/2023 | SHUT-IN | 8 | DOWN TO 0 | GAS | 0 | NO FLOW | 0 | 0 | Yes | -- | -- | This well is currently on a 7 month blowdown/build cycle. 8 PSI blew down to 0 PSI within first 30 seconds of test, no pressure or flow observed for the remainder of the test. PDC will open back up to blowdown and re-test in 30 days. |
| 403534047 | Form 17 | 9/15/2023 | 9/19/2023 | SHUT-IN | 9 | DOWN TO 0 | GAS | 0 | NO FLOW | 0 | 0 | No | -- | -- | This well is currently on a 7 month blowdown/build cycle. 9 PSI blew down to 0 PSI within first 50 seconds of test, no pressure or flow observed for the remainder of the test. PDC will open back up to blowdown and re-test in 30 days. |
| 403502751 | Form 17 | 8/18/2023 | 8/21/2023 | SHUT-IN | 13 | DOWN TO 0 | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | This well is currently on a 7 month blowdown/build cycle. 13 PSI blew down to 0 PSI within first 30 seconds of test, no pressure or flow observed for the remainder of the test. PDC will open back up to blowdown and re-test in 30 days. |
| 403472035 | Form 17 | 7/20/2023 | 7/20/2023 | SHUT-IN | 13 | DOWN TO 0 | GAS | 0 | NO FLOW | 0 | 0 | No | -- | -- | Post Blowdown/ SI test. 13 PSI slight gas blew down to 0 PSI within first minute of test. No pressure or flow observed for the remainder of the test. PDC will complete additional blowdown build test and complete new form 17 per remediation plan in 30 days. |
| 403447540 | Form 17 | 6/23/2023 | 6/28/2023 | SHUT-IN | 16 | DOWN TO 0 | GAS | 0 | NO FLOW | 0 | 0 | No | -- | -- | This well is currently on a 7 month blowdown/build cycle. 16 PSI blew down to 0 PSI within first 30 seconds of test, no pressure or flow observed for the remainder of the test. PDC will open back up to blowdown and re-test in 30 days. |
| 403414729 | Form 17 | 5/26/2023 | 5/26/2023 | SHUT-IN | 6 | DOWN TO 0 | GAS | 0 | NO FLOW | 0 | 0 | No | -- | -- | This well is currently on a 7 month blowdown/build cycle. 6 PSI blew down to 0 PSI within first 30 seconds of test, no pressure or flow observed for the remainder of the test. PDC will open back up to blowdown and re-test in 30 days.
|
| 403189233 | Form 17 | 10/4/2022 | 10/6/2022 | SHUT-IN | 360 | CONTINUOUS | GAS | 12 | CONTINUOUS | 520 | 380 | No | -- | -- | Pre-P&A. 360 PSI continuous gas flow blew down to 12 PSI within thirty minutes. PDC collected a sample 7/20/2022. |
| 403076463 | Form 17 | 6/8/2022 | 6/13/2022 | SHUT-IN | 460 | CONTINUOUS | GAS | 34 | CONTINUOUS | 625 | 625 | Yes | -- | -- | Annual Test, 460 PSI continuous gas flow blew down to 34 PSI in 30 minutes. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 7/3/2021 | 11/1/2021 | | 0 | No Flow | -- | 0 | No Flow | 270 | 270 | No | None | None | |
| Click for Specifics | Light | 9/4/2020 | 12/3/2020 | | 1 | | -- | 0 | No Flow | 0 | 0 | No | No | No | |
| Click for Specifics | Light | 9/1/2019 | 8/18/2020 | | 30 | | -- | 0 | | 400 | 400 | No | No | No | |