| 403922941 | Form 17 | 9/9/2024 | 9/16/2024 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 580 | 580 | No | -- | -- | Pre-P&A. 0 PSI, with no flow observed for 30 minutes. |
| Click for Specifics | Full | 5/7/2024 | 5/21/2024 | | 0 | No Flow | -- | 0 | No Flow | 0 | 0 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 5/25/2023 | 6/5/2023 | Shut-In | 0 | Down to Zero | -- | 0 | Down to Zero | 510 | 510 | No | None | None | |
| 403260510 | Form 17 | 12/7/2022 | 12/14/2022 | PLUNGER LIFT | 0 | NO FLOW | -- | 0 | NO FLOW | 198 | 167 | No | -- | -- | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 8/29/2021 | 11/1/2021 | | 0 | No Flow | -- | 0 | No Flow | 145 | 145 | No | None | None | |
| Click for Specifics | Light | 8/17/2020 | 12/14/2020 | | 0 | | -- | 0 | | 0 | 0 | No | No | No | |
| Click for Specifics | Light | 6/21/2019 | 8/18/2020 | | 0 | | -- | 0 | | 232 | 232 | No | No | No | |