| Click for Specifics | Full | 1/16/2026 | 1/27/2026 | | 0 | No Flow | -- | 0 | No Flow | 893 | 893 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Light | 1/30/2025 | 2/3/2025 | | 2 | | -- | 0 | | 724 | 724 | No | No | No | |
| Click for Specifics | Full | 2/16/2024 | 2/26/2024 | Shut In | 4 | Down to Zero | -- | 0 | Down to Zero | 698 | 698 | No | No | No | Annual Test. 4 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403295584 | Form 17 | 1/18/2023 | 1/19/2023 | SHUT-IN | 6 | CONTINUOUS | GAS AND LIQUID HYDROCARBON | 0 | CONTINUOUS | 243 | 243 | No | -- | -- | Annual Test. 6 PSI gas flow blew down to 0 PSI within first minute of test. Oily liquid trickled for entire test. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 5/12/2022 | 6/13/2022 | | 19 | Continuous | -- | 0 | Whisper (very low flow) | 244 | 244 | No | None | None | |
| 403036912 | Form 17 | 4/7/2022 | 5/3/2022 | PLUNGER LIFT | 18 | CONTINUOUS | WATER AND GAS | 5 | CONTINUOUS | 268 | 267 | Yes | -- | -- | Annual Test, 18 PSI continuous water and gas flow blew down to 5 PSI in 30 minutes. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 6/22/2021 | 12/21/2021 | | 18 | Water H2O | None | 4 | Water H2O | 362 | 368 | No | None | None | |
| 402614720 | Form 17 | 10/12/2020 | 3/2/2021 | | 0 | NO FLOW | NONE | 0 | NO FLOW | 475 | 475 | No | -- | -- | Abatement system follow up test 0 PSI no pressure or flow, PDC will monitor pressure and re-test in 6 months. |
| Click for Specifics | Light | 3/18/2020 | 12/14/2020 | | 0 | | -- | 0 | | 1000 | 1000 | No | No | No | |
| 402242656 | Form 17 | 11/11/2019 | 11/18/2019 | PLUNGER LIFT | 5 | SURGE | -- | 0 | CONTINUOUS | 510 | 510 | Yes | -- | Yes | Annual bradenhead test. Bradenhead surged fluid when valve opened. Sample taken and results will be uploaded into EDD when available. |
| 400316878 | Form 17 | 7/27/2012 | 8/16/2012 | PLUNGER LIFT | 238 | GAS | -- | 40 | GAS | 445 | 457 | No | -- | -- | Surface casing produced no fluid during the form 17 test. |