| Click for Specifics | Full | 1/9/2026 | 1/19/2026 | | 0 | No Flow | -- | 0 | No Flow | 1894 | 1894 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 2/5/2025 | 2/10/2025 | | 0 | No Flow | -- | 0 | No Flow | 1825 | 1825 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 2/16/2024 | 2/26/2024 | Shut In | 0 | Down to Zero | -- | 0 | Down to Zero | 1700 | 1700 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 1/18/2023 | 1/30/2023 | | 4 | Down to Zero | -- | 0 | No Flow | 852 | 852 | No | None | None | Annual Test. 4 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 1/22/2022 | 2/21/2022 | | 3 | Down to Zero | -- | 0 | No Flow | 176 | 176 | No | No | No | |
| Click for Specifics | Full | 6/22/2021 | 12/21/2021 | | 2 | Whisper (very low flow) | None | 1 | Whisper (very low flow) | 1600 | 1600 | No | None | None | |
| 402614736 | Form 17 | 10/13/2020 | 3/2/2021 | | 0 | NO FLOW | NONE | 0 | NO FLOW | 455 | 455 | No | -- | -- | Abatement system follow up test 0 PSI no pressure or flow, PDC will monitor pressure and re-test in 6 months. |
| Click for Specifics | Light | 3/18/2020 | 12/14/2020 | | 2 | | -- | 0 | | 200 | 200 | No | No | No | |
| 402242658 | Form 17 | 11/11/2019 | 11/18/2019 | PLUNGER LIFT | 0 | NO FLOW | -- | 0 | CONTINUOUS | 540 | 540 | Yes | -- | Yes | Annual bradenhead testing. Bradenhead flowed continuous stream of fluid. Fluid sampled and results will be uploaded into EDD when available. |
| 400353161 | Form 17 | 10/15/2012 | 12/3/2012 | PLUNGER LIFT | 1 | GAS | -- | 0 | DOWN TO 0 | 428 | 442 | No | -- | -- | No fluid was produced during form 17 test. |
| 400354521 | Form 17 | 10/5/2012 | 12/5/2012 | PLUNGER LIFT | 1 | GAS | -- | 0 | DOWN TO 0 | 448 | 462 | No | -- | -- | No fluid was produced during form 17 test. |
| 400287554 | Form 17 | 4/17/2012 | 5/22/2012 | PLUNGER LIFT | 1 | GAS | -- | 0 | NO FLOW | 688 | 695 | No | -- | -- | Surface casing pressure was down to zero very quickly after opening |