| 402554319 | Form 17 | 2/19/2020 | 12/15/2020 | SHUT-IN | 8 | NO FLOW | -- | 0 | NO FLOW | 200 | 200 | No | -- | -- | “Pre P&A test 8 PSI blew down to 0 PSI instantly. No pressure or flow observed for the remainder of the test. This form is being submitted to update COGCC records |
| 402080850 | Form 17 | 4/16/2019 | 6/19/2019 | PLUNGER LIFT | 100 | DOWN TO 0 | -- | 0 | NO FLOW | 200 | 200 | No | -- | -- | Annual Test 100 PSI whisper blew down to 0 PSI after 30 min. PDC will attempt to collect a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry. |