| 403174351 | Form 17 | 9/21/2022 | 9/22/2022 | SHUT-IN | 38 | CONTINUOUS | GAS | 2 | CONTINUOUS | 743 | 743 | No | -- | -- | Pre-P&A. 38 PSI continuous gas flow blew down to 2 PSI within thirty minutes. PDC collected a sample 8/19/2022. |
| 403092341 | Form 17 | 6/28/2022 | 6/29/2022 | SHUT-IN | 30 | CONTINUOUS | GAS | 0 | CONTINUOUS | 0 | 0 | Yes | -- | -- | Abatement system follow up test, 20 PSI continuous gas flow blew down to 0 PSI within thirty minutes. PDC will submit sundry with bradenhead details as soon as possible. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly. |
| 403037174 | Form 17 | 4/26/2022 | 5/4/2022 | SHUT-IN | 14 | CONTINUOUS | GAS | 0 | WHISPER | 0 | 0 | Yes | -- | -- | Annual Test, 14 PSI continuous gas blew down to 0 PSI within 30 minutes. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly. |
| 402860538 | Form 17 | 9/19/2021 | 11/3/2021 | PLUNGER LIFT | 64 | CONTINUOUS | GAS | 7 | WHISPER | 211 | 211 | Yes | -- | -- | Post-production, 64 PSI blew down to 7 PSI in thirty minutes. PDC will submit sundry with bradenhead details as soon as possible. PDC will schedule a sampling event and submit results via form 43. |
| 402865506 | Form 17 | 8/4/2021 | 11/9/2021 | | 60 | CONTINUOUS | -- | 0 | NO FLOW | 206 | 206 | Yes | -- | -- | Post-production, 60 PSI blew down to 0 PSI within first 10 minutes. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will schedule a sampling event and submit results via form 43. |
| Click for Specifics | Light | 10/21/2020 | 12/3/2020 | | 1 | | -- | 0 | No Flow | 194 | 194 | No | No | No | |
| Click for Specifics | Light | 8/24/2019 | 8/18/2020 | | 46 | | -- | 0 | | 197 | 197 | No | No | No | |