| 404104573 | Form 17 | 2/7/2025 | 2/24/2025 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | Remediation follow up test. 0 PSI, no pressure or flow observed. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404072579 | Form 17 | 1/23/2025 | 1/28/2025 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | Pre-P&A. 0 PSI, with no flow observed for 30 minutes. |
| Click for Specifics | Light | 1/2/2025 | 1/28/2025 | | 0 | | -- | 0 | | 5 | 5 | No | No | No | |
| 403654227 | Form 17 | 1/9/2024 | 1/15/2024 | SHUT-IN | 6 | CONTINUOUS | WATER AND GAS | 1 | CONTINUOUS | 0 | 0 | No | -- | -- | Annual Test. 6 PSI gas and continuous strong fluid trickle blew down to 1 PSI in 30 minutes. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 3/21/2023 | 4/10/2023 | | 0 | No Flow | -- | 0 | No Flow | 0 | 0 | No | None | None | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 4/26/2022 | 5/9/2022 | | 13 | Down to Zero | -- | 0 | Down to Zero | 0 | 0 | No | No | No | |
| Click for Specifics | Full | 10/6/2021 | 11/1/2021 | | -- | Down to Zero | -- | 0 | No Flow | 330 | 400 | No | None | None | |
| Click for Specifics | Light | 4/26/2020 | 5/11/2020 | | 10 | | -- | 10 | | 225 | 225 | No | No | No | |
| Click for Specifics | Light | 10/24/2019 | 8/18/2020 | | 6 | | -- | 0 | | 360 | 360 | No | No | No | |