| 402019529 | Form 17 | 1/31/2019 | 4/24/2019 | PLUNGER LIFT | 32 | GAS | -- | 1 | GAS | 1213 | 1213 | No | -- | -- | Surface casing produced condensate. Blew down an extra 30min ended witha whisper. Surface casing shut in for 15min ended with psi.
Well and master shut in. |
| 401876843 | Form 17 | 12/13/2018 | 12/17/2018 | PLUNGER LIFT | 21 | GAS | -- | 1 | WHISPER | 1363 | 1363 | No | -- | -- | Surface casing produced no fluids. Blew down surface casing an extra 30 minutes ended with a whisper. Surface casing shut in for 15 minutes ended with a whisper. |
| 401206582 | Form 17 | 2/1/2017 | 2/9/2017 | | 1 | WHISPER | -- | 0 | DOWN TO 0 | 716 | 714 | No | -- | -- | SURFACE CSG PRODUCED NO FLUIDS. SHUT IN SURFACE CSG FOR 15 MIN.; ENDED WITH 0 PSI.
|