| Click for Specifics | Full | 1/22/2026 | 1/27/2026 | | 0 | No Flow | -- | 0 | No Flow | 0 | 0 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Light | 1/5/2025 | 1/28/2025 | | 0 | | -- | 0 | | 1 | 1 | No | No | No | |
| Click for Specifics | Full | 2/27/2024 | 3/19/2024 | Shut In | 0 | Down to Zero | -- | 0 | Down to Zero | 500 | 500 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 1/23/2023 | 1/30/2023 | | 5 | Down to Zero | -- | 0 | No Flow | 1200 | 1200 | No | None | None | Annual Test. 5 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 4/27/2022 | 5/9/2022 | | 3 | Down to Zero | -- | 0 | No Flow | 1270 | 1270 | No | No | No | |
| Click for Specifics | Full | 1/13/2022 | 2/21/2022 | | 2 | Down to Zero | -- | 0 | Down to Zero | 1180 | 1180 | No | No | No | |
| Click for Specifics | Full | 4/13/2021 | 12/21/2021 | | 5 | Down to Zero | None | 4 | Down to Zero | 800 | 800 | No | None | None | |
| 402899651 | Form 17 | 4/13/2021 | 12/15/2021 | SHUT-IN | 5 | WHISPER | -- | 4 | WHISPER | 800 | 800 | Yes | -- | -- | Annual Test, 5 PSI whisper blew down to 4 PSI in thirty minutes. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly. |
| Click for Specifics | Light | 7/9/2020 | 12/3/2020 | | 1 | | -- | 0 | No Flow | 11 | 11 | No | No | No | |
| Click for Specifics | Light | 10/1/2019 | 8/18/2020 | | 0 | | -- | 0 | | 640 | 640 | No | No | No | |