| 404071352 | Form 17 | 1/16/2025 | 1/27/2025 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 800 | 800 | No | -- | -- | Pre-P&A. 0 PSI, with no flow observed for 30 minutes. |
| Click for Specifics | Full | 4/19/2024 | 4/30/2024 | | 0 | No Flow | -- | 0 | No Flow | 0 | 0 | No | No | No | |
| Click for Specifics | Full | 6/28/2023 | 7/10/2023 | | 0 | No Flow | -- | 0 | No Flow | 0 | 0 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 11/15/2022 | 11/29/2022 | | 0 | No Flow | -- | 0 | No Flow | 0 | 0 | No | None | None | |
| 402746313 | Form 17 | 7/9/2021 | 7/13/2021 | SHUT-IN | 0 | WHISPER | GAS | 0 | NO FLOW | 240 | 250 | No | -- | -- | Test per NTO. Whisper on open for 15 seconds and died. No flow for remainder of test. |
| Click for Specifics | Light | 9/21/2020 | 2/8/2021 | | 0 | | -- | 0 | No Flow | 242 | 245 | No | No | No | |
| 402164820 | Form 17 | 9/2/2019 | 9/3/2019 | FLOWING | 0 | NO FLOW | -- | 0 | NO FLOW | 300 | 300 | No | -- | -- | Test per NTO. BH dead |