403174417 | Form 17 | 9/20/2022 | 9/22/2022 | PLUNGER LIFT | 0 | DOWN TO 0 | GAS | 0 | NO FLOW | 480 | 480 | No | -- | -- | Pre-P&A. 0 PSI, with no flow observed for 30 minutes. |
Click for Specifics | Full | 4/6/2022 | 4/18/2022 | | 0 | Down to Zero | -- | 0 | Down to Zero | 160 | 160 | No | No | No | |
Click for Specifics | Full | 6/9/2021 | 11/1/2021 | | 0 | No Flow | -- | 0 | No Flow | 550 | 520 | No | None | None | |
402422623 | Form 17 | 3/10/2020 | 6/15/2020 | | 0 | NO FLOW | -- | 0 | NO FLOW | 465 | 500 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
402073697 | Form 17 | 3/28/2019 | 6/13/2019 | SHUT-IN | 54 | DOWN TO 0 | -- | 0 | WHISPER | 910 | 910 | No | -- | -- | Annual Test 54 PSI whisper blew down to 0 PSI after 30 min. PDC will attempt to collect a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry. |
401991205 | Form 17 | 3/28/2019 | 4/1/2019 | SHUT-IN | 54 | DOWN TO 0 | -- | 0 | WHISPER | 910 | 910 | Yes | -- | -- | Annual bradenhead test 54PSI blew down to zero. PDC will submit remediation proposal via sundry. |
400701617 | Form 17 | 10/2/2014 | 10/6/2014 | PLUNGER LIFT | 3 | DOWN TO 0 | -- | 0 | NO FLOW | 250 | 250 | No | -- | -- | |