| 404398691 | Form 17 | 9/24/2025 | 10/21/2025 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 700 | 700 | No | -- | -- | Pre-P&A. 0 PSI, with no flow observed for 30 minutes. |
| Click for Specifics | Light | 1/12/2025 | 1/28/2025 | | 0 | | -- | 0 | | 615 | 617 | No | No | No | |
| Click for Specifics | Full | 1/8/2024 | 1/18/2024 | Plunger Lift | 0 | Down to Zero | -- | 0 | Down to Zero | 626 | 304 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 3/10/2023 | 3/27/2023 | | 0 | Down to Zero | -- | 0 | Down to Zero | 367 | 264 | No | None | None | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 4/6/2022 | 4/18/2022 | | 0 | No Flow | -- | 0 | No Flow | 643 | 643 | No | No | No | |
| Click for Specifics | Full | 5/13/2021 | 11/1/2021 | | 0 | No Flow | -- | 0 | No Flow | 600 | 600 | No | None | None | |
| Click for Specifics | Light | 11/7/2020 | 12/14/2020 | | 0 | | -- | 0 | | 0 | 0 | No | No | No | |
| Click for Specifics | Light | 6/9/2019 | 11/27/2019 | | 25 | | | 0 | | 642 | 642 | No | No | No | |