| Click for Specifics | Full | 2/13/2025 | 2/17/2025 | | 0 | No Flow | -- | 0 | No Flow | 0 | 0 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403728875 | Form 17 | 3/22/2024 | 3/22/2024 | SHUT-IN | 30 | CONTINUOUS | WATER AND GAS | 0 | CONTINUOUS | 0 | 0 | No | -- | -- | Annual test. 30 PSI continuous water and gas flow blew down to 0 PSI in 30 minutes, ~10 gallons . PDC will monitor pressure and re-test according to bradenhead policy. |
| 403284426 | Form 17 | 1/9/2023 | 1/10/2023 | SHUT-IN | 32 | DOWN TO 0 | WATER AND GAS | 5 | CONTINUOUS | 883 | 883 | Yes | -- | -- | Abatement system follow up test. 32 PSI continuous gas and water flow blew down to 5 PSI within thirty minutes through 1/2" needle valve. PDC will submit sundry with bradenhead details as soon as possible. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly. |
| 403100610 | Form 17 | 7/8/2022 | 7/11/2022 | SHUT-IN | 50 | DOWN TO 0 | GAS | 2 | CONTINUOUS | 857 | 857 | Yes | -- | -- | High Gauge Pressure Follow-up, 50 PSI gas and water flow blew down to 0 PSI within first 5 minutes of test. After 15 minutes, gas and dark water flow began with motor valve open. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 8/4/2021 | 11/1/2021 | | 10 | Down to Zero | -- | 0 | No Flow | 0 | 0 | No | None | None | |
| Click for Specifics | Light | 10/18/2020 | 12/3/2020 | | 40 | | -- | 0 | No Flow | 542 | 542 | No | No | No | |
| Click for Specifics | Light | 6/11/2019 | 11/27/2019 | | 30 | | | 0 | No Flow | 421 | 421 | No | No | No | |