| 401235153 | Form 17 | 3/9/2017 | 3/16/2017 | | 1 | WHISPER | -- | 0 | DOWN TO 0 | 0 | 0 | No | -- | -- | SURFACE CSG PRODUCED NO FLUIDS. SHUT IN SURFACE CSG FOR 15 MIN.; ENDED WITH A WHISPER. FRAC VALVE INSTALLED. CSG WAS ON A VACUUM.
|
| 400982814 | Form 17 | 3/13/2015 | 2/2/2016 | | 1 | GAS | -- | 0 | DOWN TO 0 | -- | -- | No | -- | -- | SC PRODUCED NO FLUIDS DURING TEST. SHUT IN SC FOR 15 MIN ENDED WITH A WHISPER OF GAS. WELL SHUT IN AND TORN APART FOR HZ PREP. |