| 404251816 | Form 17 | 4/4/2025 | 6/23/2025 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | Pre-P&A. 0 PSI, with no flow observed for 30 minutes.
|
| Click for Specifics | Light | 1/13/2025 | 1/28/2025 | | 0 | | -- | 0 | | 171 | 170 | No | No | No | |
| Click for Specifics | Full | 1/10/2024 | 1/18/2024 | Shut In | 0 | Down to Zero | -- | 0 | Down to Zero | 629 | 629 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 3/7/2023 | 3/27/2023 | | 0 | Down to Zero | -- | 0 | Down to Zero | 309 | 309 | No | None | None | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 7/26/2022 | 8/9/2022 | | 0 | Down to Zero | -- | 0 | Down to Zero | 647 | 647 | No | None | None | |
| Click for Specifics | Full | 6/12/2021 | 11/1/2021 | | 0 | No Flow | -- | 0 | No Flow | 684 | 684 | No | None | None | |
| Click for Specifics | Light | 8/23/2020 | 12/3/2020 | | 0 | | -- | 0 | No Flow | 653 | 653 | No | No | No | |
| Click for Specifics | Light | 6/12/2019 | 11/27/2019 | | 0 | | | 0 | No Flow | 336 | 336 | No | No | No | |
| 400416520 | Form 17 | 4/24/2013 | 5/10/2013 | PLUNGER LIFT | 1 | GAS | -- | 0 | DOWN TO 0 | 491 | 494 | No | -- | -- | Surface casing produced no fluids during 30 min. test. |