| 401696531 | Form 17 | 7/2/2018 | 7/9/2018 | | 1 | WHISPER | -- | 0 | DOWN TO 0 | 531 | 531 | No | -- | -- | SURFACE CASING PRODUCED NO FLUIDS. SURFACE CASING SHUT IN 15 MIN ENDED WITH 0 PSI. WELL AND MASTER SHUT IN. |
| 401601758 | Form 17 | 3/28/2018 | 4/10/2018 | | 1 | WHISPER | -- | 0 | DOWN TO 0 | 595 | 595 | Yes | Yes | -- | Surface casing produced no fluids. Surface casing shut in for 15 min ended with 0 PSI. Well and master shut in. |
| 400966985 | Form 17 | 12/31/2015 | 1/8/2016 | | 1 | GAS | -- | 0 | DOWN TO 0 | 554 | 551 | No | -- | -- | SC DID NOT PRODUCE ANY FLUID. 15 IN BUILD UP, WHISPER |
| 400734000 | Form 17 | 10/21/2014 | 11/18/2014 | PLUNGER LIFT | 0 | DOWN TO 0 | -- | 0 | DOWN TO 0 | 388 | 387 | No | -- | -- | SC DID NOT PRODUCE ANY FLUID, DEMCO AND GROUND VALVE CLOSED UPON ARRIVAL |
| 2605079 | Form 17 | 2/2/2010 | 3/3/2010 | PLUNGER LIFT | 0 | NO FLOW | -- | 0 | NO FLOW | 450 | 450 | No | -- | -- | Zero pressure on Bradenhead, no fluid. |