Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-15264VANDERHOOF
13-5F
PDC ENERGY INC
69175
SI
5/1/2023
WATTENBERG
90750
WELD  123
SWNW 13 4N66W 6
327872
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 500 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404526993Form 171/26/20261/30/2026SHUT-IN28DOWN TO 0 GAS1 CONTINUOUS 10671065No---- 
404323750Form 178/1/20258/20/2025SHUT-IN16CONTINUOUS GAS0 NO FLOW 10481048No----Remediation follow up test. 16 PSI blew down to 0 PSI within five minutes of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy.
404087544Form 171/31/20252/10/2025SHUT-IN17CONTINUOUS GAS1 SURGE 00No----Annual Test. 17 PSI blew down to 1 PSI within thirty minutes. Surge of water and gas at the end of test and continued for remainder of test. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull2/8/20242/19/2024Shut In12No Flow--0No Flow00NoNoNoAnnual Test. 12 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
403301111Form 171/13/20231/25/2023SHUT-IN14DOWN TO 0 GAS0 CONTINUOUS 900900No----Annual Test. 14 PSI gas blew down to 0 PSI within first minute of test. Fluid trickle started at 13 minute mark and continued through the remainder of the test. PDC will continue to monitor monthly.
403194302Form 179/27/202210/11/2022SHUT-IN14DOWN TO 0 GAS5 CONTINUOUS 00Yes----Annual Test. 14 PSI gas flow blew down to 0 PSI within first minute of test. Steady stream of water started at 20 minute mark and pressure at end of test was 5 PSI. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly.
Click for SpecificsFull10/26/202111/22/2021 20Down to Zero--0No Flow800800NoNoneNone 
402615345Form 1712/15/20203/3/2021 0DOWN TO 0 GAS0 NO FLOW 350350No----Abatement system follow up test 0 PSI no pressure or flow, PDC will monitor pressure and re-test in 6 months.
Click for SpecificsLight11/7/202012/14/2020 0 --0 00NoNoNo 
402244297Form 1711/18/201911/20/2019PLUNGER LIFT20WATER H20 --0 CONTINUOUS 140140Yes--YesAnnual bradenhead testing. Bradenhead flowed water continuously during test. Fluid will be sampled and results uploaded into EDD when available.
1796685Form 175/4/19948/19/2009FLOWING400 ---- --400No----