| 402545784 | Form 17 | 11/28/2020 | 12/3/2020 | SHUT-IN | 25 | DOWN TO 0 | -- | 0 | NO FLOW | 641 | 641 | No | -- | -- | Pre P&A Test, 25 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test.
|
| 402518472 | Form 17 | 10/12/2020 | 10/26/2020 | | 80 | GAS | -- | 0 | DOWN TO 0 | 635 | 650 | Yes | -- | -- | Annual Test 80 PSI with continuous flow, blew down to 0 PSI after 30 min. PDC has collected a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry. |
| 402251312 | Form 17 | 11/25/2019 | 12/2/2019 | PLUNGER LIFT | 40 | GAS | -- | 5 | GAS | 565 | 565 | Yes | Yes | -- | Annual bradenhead test. Bradenhead flowed gas when opened. Gas will be sampled and test results uploaded into EDD when available. |