| 402162517 | Form 17 | 8/28/2019 | 8/30/2019 | PLUNGER LIFT | 1 | WHISPER | -- | 0 | DOWN TO 0 | 76 | 75 | No | -- | -- | Surface casing produced no fluids. 15 minute shut in results in 0 psi. Tubing shut in. |
| 401919704 | Form 17 | 1/16/2019 | 1/28/2019 | | 1 | WHISPER | -- | 0 | DOWN TO 0 | 98 | 98 | No | -- | -- | SURFACE CASING PRODUCED NO FLUIDS. SHUT-IN FOR 15 MIN; ENDED WITH 0 PSI. WELL AND MASTER VALVE SHUT IN. |
| 400857328 | Form 17 | 6/15/2015 | 6/23/2015 | PLUNGER LIFT | 1 | GAS | -- | 0 | DOWN TO 0 | 753 | 752 | No | -- | -- | POST REMEDIATION TEST. SC DID NOT PRODUCE ANY FLUID. 15 MIN BUILD UP, WHISPER. OPEN TO SALES AND TEMP SHUT IN FOR HZ PREP UPON ARRIVAL. INITIAL POST REMEDIATION BLOW DOWN ON 6-9-2015 STARTED WITH A WHISPER AND BLEW DOWN TO ZERO PSI. |
| 400367032 | Form 17 | 12/7/2012 | 1/9/2013 | PLUNGER LIFT | 69 | GAS | -- | <1 | CONTINUOUS | 459 | 467 | No | -- | -- | Surface casing produced 15 gallons of condensate during the form 17 test. |