| 404340613 | Form 17 | 8/29/2025 | 9/3/2025 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 435 | 435 | No | -- | -- | Pre-P&A. 0 PSI, with no flow observed for 30 minutes. |
| Click for Specifics | Light | 1/16/2025 | 1/28/2025 | | 0 | | -- | 0 | | 582 | 582 | No | No | No | |
| Click for Specifics | Full | 1/10/2024 | 1/18/2024 | Shut In | 0 | Down to Zero | -- | 0 | Down to Zero | 452 | 452 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 3/7/2023 | 3/27/2023 | | 0 | Down to Zero | -- | 0 | Down to Zero | 355 | 361 | No | None | None | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 7/26/2022 | 8/9/2022 | | 0 | Down to Zero | -- | 0 | Down to Zero | 523 | 523 | No | None | None | |
| Click for Specifics | Full | 6/8/2021 | 11/1/2021 | | 0 | No Flow | -- | 0 | No Flow | 337 | 337 | No | None | None | |
| Click for Specifics | Light | 5/27/2020 | 12/14/2020 | | 0 | | -- | 0 | | 0 | 0 | No | No | No | |
| Click for Specifics | Light | 6/12/2019 | 11/27/2019 | | 0 | | | 0 | No Flow | 498 | 498 | No | No | No | |
| 400415551 | Form 17 | 4/24/2013 | 5/8/2013 | PLUNGER LIFT | 52 | GAS | -- | <1 | GAS | 405 | 406 | No | -- | -- | Surface casing produced no fluids during 30 min. test. |