| Click for Specifics | Full | 1/20/2026 | 1/27/2026 | | 0 | No Flow | -- | 0 | No Flow | 670 | 670 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Light | 1/4/2025 | 1/28/2025 | | 0 | | -- | 0 | | 500 | 500 | No | No | No | |
| Click for Specifics | Full | 1/16/2024 | 1/23/2024 | Plunger Lift | 0 | Down to Zero | -- | 0 | Down to Zero | 450 | 450 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 6/9/2023 | 6/20/2023 | | 0 | Down to Zero | -- | 0 | Down to Zero | 500 | 500 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 3/28/2022 | 4/18/2022 | | 0 | Down to Zero | -- | 0 | Down to Zero | 900 | 900 | No | No | No | |
| Click for Specifics | Full | 6/27/2021 | 11/1/2021 | | 0 | Down to Zero | -- | 0 | Down to Zero | 400 | 400 | No | None | None | |
| Click for Specifics | Light | 12/9/2020 | 12/14/2020 | | 0 | | -- | 0 | | 275 | 275 | No | No | No | |
| Click for Specifics | Light | 7/14/2019 | 8/18/2020 | | 2 | | -- | 0 | | 800 | 800 | No | No | No | |